|
|
Cost Savings through Increased Operational Efficiency and Higher Tester Utilization
In board-level production, a successfully automated test phase removes the last bottleneck from the line and increases the utilization rate of expensive test equipment, which alone may provide a short payback period for the automation investment. When testing is performed before moving on to each new production phase, the causes of defects can be tracked down and corrected immediately with minimum effort and the minimum number of defective products manufactured.
Rohwedder offers a line of in-circuit test handlers developed in co-operation with the leading test system manufacturers. The extremely smooth integration of our equipment, with test systems on both the software and the hardware level, secures a very high throughput for the test cells. Our products include several features to increase the reliability of contacting: robust structure, increased force for the probe compression and high speed of the probe actuation. The cells also feature good ergonomics and accessibility.
Reach better yields, higher delivery quality and accuracy with our test automation tools.
|